The brain of your engineering office

Win more work, at better margins, with the same teams.

We are building an always-on engineering office, shared by sales, engineering and site teams.

The problem

The takeoff is not an expensive task. It is the bottleneck.

Of those 6 weeks, the takeoff takes 2 to 3 and ties up 4 to 5 people.

What gets dropped

  • Alternatives.
  • Value engineering.
  • The technical proposal.

The only things that win the job.

The organisation

The whole company was built around a scarcity.

Pricing takes a specialist. The whole structure follows from that.

  1. The owner prices alone, for as long as they can.
  2. Then they hire a bid manager.
  3. Then an estimator.
  4. Then they set up an engineering office.

Sales and engineering work in sequence, passing the file back and forth. And six months after the bid goes in, the site team redoes the study.

The thesis

An always-on brain. The engineering office becomes the foundation.

It stops being a step between sales and site. It becomes the foundation of both, and capacity no longer depends on headcount.

  • Sales draws on it. Every salesperson has the company’s engineering office at hand, at all times, and answers without waiting.
  • The engineering office governs it. It stops producing: it encodes the house doctrine and rules on edge cases.
  • The site corrects it. It picks up the same object and corrects the estimates.

Not a generic engineering office. Yours.

Your company’s own, with its counting rules, its conventions, its methods and its prices.

Corner reinforcements: how do we count them on this package?

Per unit, for each external corner.

House rule · decided by the engineering office

Illustration of what we are building

The mechanism · today

80%

of the time spent producing.

Reading, reconciling, tracing, deducting, checking. That leaves 20% for winning.

The mechanism · with Mansart

80%

of the time spent winning the job.

Alternatives, value engineering, suppliers, prices, technical proposal.

The remaining 20% is not a leftover: it is where experts rule on uncertain cases, and where the house doctrine gets encoded.

What we measure

We do not count hours saved. We count jobs won.

Same project, same duration. The win rate for a constant number of tenders, and the volume of work won.

Structural design

The takeoff counts the structure. The design sizes it.

On the same object, with nothing re-entered. Slabs, walls, columns, beams, foundations: load takedown, then an element-by-element check, to the Eurocodes. Seismic design and an indicative carbon figure follow.

It is a preliminary design for pricing, not a construction drawing. It comes with its calculation report.

Alternatives no longer get dropped. They get compared.

A thickness, a concrete, a steel: each alternative is recalculated on the same structure, and anything that fails is flagged.

Calculation v4 · Eurocodes, French National Annex
AlternativeSteel tConcrete m³Carbon tCO₂eFailing
Base model42.06102220
20 cm slabs43.15822181
Recycled steel42.06101680

Slab D3 fails: 104%

Quantities: takeoff · Factors: Base Carbone · Indicative carbon

Illustration of what we are building
  • Every value has its source. Read from the documents, assumed, or to be checked: it is written next to the figure.
  • Out of scope, it says so. When the simplified method no longer applies, the engine writes it down. It never gives a figure instead.
  • One assumption changes, everything is recalculated. Concrete, loads, ground: the result follows at once. Each calculation is numbered and cited in the report.

The engine reruns published examples and hand calculations. Expected, calculated, deviation, tolerance: the validation report can be downloaded.

Continuity

One single object, from pre-sales to site.

Today, the takeoff is redone three to five times over the life of a project. Each time by a different person, in a different tool, and the link to the original is cut.

The site manager does not redo the study.

They pick it up and refine it, and each of their corrections stays attached to the original structure. The gap becomes measured and attributable, and makes the next estimate more accurate.

The three loops

Every job makes the next one more accurate.

Expertise improves
Source The engineering office’s rulings
Learns How this company counts
Real prices sharpen
Source Supplier quotes
Learns What it really costs, and from whom
The site answers
Source What happens on site
Learns Whether the estimate was right, and the level of additional works

A foundation model will soon read any drawing. It will never know how this company counts its corner reinforcements, nor what this supplier actually charged it, nor by how much this type of structure drifts on site.

The slowest loop is the highest barrier.

A tender-stage takeoff never has ground truth: the site does the marking. The site side is not a phase 2, it is what feeds the brain. Without it, the system learns the doctrine and the prices, never reality.

The roadmap

Five sentences to make true.

Where we are going, step by step. The first is under way, the rest are ahead of us.

  1. M1 · Reliable foundation Under way

    “Your experts no longer trace.”

    Provenance of every quantity, no regression on deductions and exclusions, net gain measured per package.

  2. M2 · Doctrine

    “The company’s engineering office, for every salesperson.”

    A first client’s doctrine encoded. Every ruling becomes a rule.

  3. M3 · Continuity

    “The site manager does not redo the study.”

    A first site in construction on the same object. Gap between planned and actual measured.

  4. M4 · Real prices

    “Your prices are compared with what you actually paid.”

    Supplier orchestration and price history.

  5. M5 · Commercial intelligence

    “You bid for the jobs you win.”

    Go or no-go, pricing decision, won-or-lost loop.

Your company has a doctrine. Let’s encode it.

Thirty minutes to look together at how you count, and where your next job will be won.